Tuesday, November 5, 2019
Armistice Day has Lost its Meaning
A look at why Armistice Day has currently lost meaning for American society. This is an argumentative paper that deals with the lost meaning of Armistice Day, or as it is better known, Veterans Day. The author argues that this American holiday has lost significance and meaning as a memorial day.With 500,000 cheering, flag-waving spectators lining the way, and thundering drums flanked by nostalgic Glenn Miller swing music on the autumn air, tens of thousands of proud American warriors marched out of the past and up Fifth Avenue in New Yorks largest Veterans Day Parade since the end of World War II.This 1995 parade was a victory of sorts due to the fact that, in recent years, Veterans Day observations have become, as Robert McFadden says,desultory at best, with spectators often limited to passers-by walking their dogs or heading out for a quart of milk(On Parade).This parade was evidence of a revival in veteran appreciation, and a renewal of Veterans Day as a much celebrated American holiday.But while this parade can be used to model a renewal in ceremony and e nthusiasm, the true meaning of Veterans Day, or Armistice Day as it was originally called, has been lost.
Saturday, November 2, 2019
Waste Management Strategy Research Paper Example | Topics and Well Written Essays - 1000 words
Waste Management Strategy - Research Paper Example The basic aim was to derive the analytical framework guiding different phases of this Project. Goals of Project (Week 1): The project performed a business simulation on the T5 programme using important theoretical study features resulting in the following hypothesis to be tested as per current progress: the T5 programme is on schedule and within the project management scope of costs, time and budgetary constraints. The sub-goals of the project were identified in terms of research goals: Results presentation (Weeks 1-2): A detailed planning made for of different areas of interest for T5 programme: 1. Reviewing current status at T5; 2.Analysing the research questions; 3. Discussing basic methods of waste management being employed; 4. Points to be kept in mind for design e.g. software such as Autodesk; 5. Recycling methods (85% recycling results); 6. Environmental concerns/legislative actions.; 7. Operational risk management study; 8. Other aspects such as finances, etc. The author's main purpose in presenting all possible result areas, was to achieve a reasonable amount of self-sufficiency in tackling any future challenging projects (provided they meet funding criteria) and to develop a solid career in this emerging field. 2. Literature Review Raw Data sources (Weeks 2-5): During this phase, the author researched different learning materials (both research as well as case studies) to determine whether the T5 construction project was being handled efficiently (Refer Week 1 hypothesis). The literature sources varied from BAA brochures to various data collected from field sources. A significant deficiency in this proposal was the lack of primary data (interviews). Since the T5 project is currently under construction, it was proprietary and classified information not available in public domain. Upon a request to consultants dealing in recycle strategies as applied to design and development, most declined to comment on the exact nature of these strategies, especially the financial parts and the underlying methods in isolating key materials being used. The best guess was to look into a case study approach based on inferential and exploratory data from secondary sources. Development of data sources (Weeks 5-9): The most important phase of the project, the main aim was to build up the state of the art in relation to T5
Subscribe to:
Comments (Atom)